© 2014 by Prairie Environmental Consulting, LLC. Proudly created with Wix.com

Completed Projects

Prairie Environmental Consulting worked with various tenants of The Empire Mall to conduct bulk and air sampling for mold before and after water intrusion mitigation following significant flooding of the facilities in August, 2015.

Former JCPenney Building Hazardous Materials Survey - Lakewood Mall - Aberdeen, SD (October 2015)

Prairie Environmental Consulting was contracted by Watterson Environmental and Facility Management to conduct a complete hazardous materials assessment of a former JCPenney retail store in the Lakewood Mall in Aberdeen, SD in anticipation of a full re-model.  Jason Biggins completed a full asbestos survey, a lead paint inspection, floor plan sketch drawings, as well as survey of all flourescent fixtures and ballasts, mercury switches, and other potential hazardous material sources. 

 

 

CCC Information Services, Inc. Indoor Air Quality Testing - Sioux Falls, SD (August 2015)

Prairie Environmental Consulting was contracted by CCCIS, Inc., located in Sioux Falls, SD, to conduct indoor air quality testing, as well as mold testing, on both floors of the company's large downtown commercial building. 

 

 

Former Shenanigan's Sports Bar Asbestos and Mold Survey - The Empire Mall - Sioux Falls, SD (July, 2015)

Prairie Environmental Consulting was contracted by a national restaurant chain to conduct a complete asbesetos survey, as well as a mold inspection (including air sampling), in anticipation of a full re-model of a space in The Empire Mall in Sioux Falls, SD.

 

 

Howard Armory Asbestos Abatement - Third Party Project Air Monitoring - Howard, SD (April 2015)

Prairie Environmental Consulting was contracted by Gary Snow & Associates, Inc. to conduct third party air monitoring during asbestos abatement work at the Howard Armory in Howard, SD.  Backrgound, working and clearance samples were taken before, during, and after abatement work.

 

 

Prairie Environmental Consulting designed a work plan for a complete exterior lead paint abatement of the Pyle House in Huron, SD.

 

 

Lead Paint Abatement Work Plan - Pyle House - Huron, SD (Summer 2015)

Tires Plus/Firestone Asbestos Flooring Surveys - Sheridan, WY; Rapid City, SD; Sioux Falls, SD (2016-2017)

Prairie Environmental Consulting was contracted by Watterson Environmental and Facility Management to conduct a complete flooring profile of three Tires Plus/Firestone locations in South Dakota and Wyoming. 

 

 

Complete Asbestos Survey - Evans Building - Hot Springs, SD (September 2017)

Prairie Environmental Consulting was contracted by Dominion Due Diligence Group from Midlothian, Virginia to conduct a complete asbestos survey of the historic Evans Building (now Evans Apartments) in Hot Springs, SD.